Considerations for Project Imports
You may import existing projects into a Datical DB work space using the Import Wizard in the Datical DB GUI. Here are a few best practices to ensure the import goes as smoothly as possibleis successful:
Remove Old, Unneeded Files from Your Project - Over time, you may accumulate a large quantity of reports and log files for which you no longer need ready access.
removinWarning Reports and logs may be safely deleted, but
removing items from the Resources directory can lead to operation failures. We recommend that you DO NOT alter items in the Resources directory.
Copy the Project Directory to the Datical Workspace Before Performing the Import - There are known issues in the Eclipse framework that could lead to partial project imports if you select the 'Copy projects into workspace' option when importing a large project with many files. To ensure that the entire project is available in the Datical DB workspace, we recommend that the project directory be copied into the workspace manually before the import is performed for large projects. By default the Datical workspace is a directory named 'datical' in the user's home directory.
Expand title Screenshot of the import option to avoid Note DO NOT enable the box outlined in the picture below. Instead, copy the Datical project directory to your Datical workspace manually prior to launching the import wizard.
Datical DB Project Import Instructions
The following example illustrates the steps you need to take to import a project.
- Start the Datical DB GUI.
- Select File > Import.
- Select Existing Imports and Deployment Projects and click Next
Select Select Archive File, then click Browse button to select a project for import.
The new project is isted - You can import multiple projects in the same operation by putting several Datical projects in a common directory or in a zip archive. Depending on the method you employ, select the appropriate option and then click the Browse button to select select your directory or archive.
- Projects in the directory or the archive should now be listed in the middle Projects. panel. Make sure the project is selected, Select the projects you wish to import and then click Finish.
- The project is projects are imported and you will see the new project projects in the Deployment Plans list (left panel) of Datical DB.
- After you have imported the project(s), when you are ready to close the GUI it is important to use the red X option. Close the GUI using the red X in the top right corner after importing projects. (Do NOT use the "File" then "Exit" option in the top left corner as it may cause errors upon reopening.)